Woodford Group – Bamber Bridge
Main Contractor
Eric Wright Construction Limited
Sure4orm had involvement for the interior walling, ceilings for this contract. Circa £200,000.
Description
Four-storey office building, constructed using a steel frame clad with glazing and traditional brickwork / blockwork outer walls, with stone features to the main body of the building and Ashlar stone feature to the staircores. Internal block walls were required to the lift shaft, stair cores and toilet areas.
Details
This contract was completed on time and to a high standard. Easibuild provided all supervision to this contract by regular visits from our management team and our safety officer to ensure all our quality procedures were followed. Manual Handling was highlighted as an issue prior to our commencement and appropriate systems were put in place to overcome the problem.
Fire Risk Assessment Manchester was assisted by Armstrong Fire Management.